El Paso Electric operates under a fundamentally different structure than the rest of Texas solar. Because EPE serves the El Paso and Las Cruces markets in the Western Interconnection rather than ERCOT, it functions as a vertically integrated regulated utility — owning generation, transmission, and distribution, and selling electricity directly to customers under rates approved by the Public Utility Commission of Texas (for the Texas side) and the New Mexico Public Regulation Commission (for the New Mexico side). There is no REP market in El Paso; no REP shopping, no buyback plan comparison. EPE sets all solar terms directly.
EPE’s Distributed Generation (DG) program provides net metering for solar systems up to 50kW — a threshold that comfortably covers all residential systems. Every kilowatt-hour exported to the EPE grid during a billing period earns a credit at EPE’s current residential retail rate, offsetting future consumption on a kilowatt-hour basis. Monthly credits roll forward. At year-end, any remaining surplus credits are paid out at EPE’s avoided cost rate rather than the full retail credit rate — the same structure as Florida’s IOUs and Maine’s CMP, where year-end excess is compensated below retail. EPE imposes a minimum monthly bill of $30.25, meaning a solar system that fully offsets a home’s consumption still owes this minimum regardless of credit balance. System sizing is limited to annual consumption — EPE does not permit significant oversizing beyond historical usage.
El Paso’s solar production fundamentals are extraordinary by any measure. NREL’s PVWatts tool calculates 1,830 kilowatt-hours of annual production per kilowatt of installed capacity for a south-facing tilted system in El Paso — the highest figure among all five Texas cities in this dataset and among the highest in the continental United States. This figure surpasses Phoenix (approximately 1,750 kWh/kW), rivals parts of the Mojave Desert, and reflects El Paso’s combination of high elevation (3,700 feet), extreme solar irradiance, and exceptionally clear, dry Chihuahuan Desert air with minimal atmospheric scattering. El Paso averages more than 6.0 peak sun hours daily — competitive with the best Arizona markets — and receives more than 300 sunny days per year.
The practical implication: a 10kW system in El Paso produces approximately 18,300 kilowatt-hours annually, compared to approximately 14,500–15,000 kilowatt-hours from an equivalent system in Dallas or Houston. That additional production, credited at EPE’s retail rate through net metering, directly accelerates payback and increases 25-year savings relative to lower-irradiance Texas markets. El Paso’s high-desert summers are also extremely hot — temperatures regularly exceeding 100°F from June through August — creating high daytime AC loads that absorb solar production at retail rates before hitting the export threshold. The combination of world-class irradiance and heat-driven self-consumption makes El Paso’s solar economics the strongest in the Texas dataset.
El Paso solar installations run $1.95–$2.35 per watt — among the lowest in Texas, reflecting the competitive West Texas and border market installer base. A typical El Paso system of 8kW–11kW costs approximately $15,600–$25,850 before incentives. Texas’s 100% property tax exemption (Texas Tax Code Section 11.27) prevents any El Paso County property tax increase from the installation. No state income tax credit, no statewide rebate. No federal residential ITC for cash or loan purchases in 2026. Solar leases and PPAs are available in El Paso through national installers — El Paso Electric does not prohibit third-party ownership as Florida does. At EPE’s current residential rate and El Paso’s exceptional irradiance, cash-purchase payback runs approximately 8–10 years — the fastest in the Texas dataset and among the stronger results nationally for a market without the federal residential ITC. Over 25 years, system savings estimates run $30,000–$50,000 for well-sized El Paso systems.
Est. 2025
Est. 2016
Est. 2009
Est. 2009
Est. 2015
Est. 2006